
The retaining wall is complete and now needs back-filling. We have gravel on the lower terrace and this will have to be taken up by wheelbarrow and tipped down the wall. We will need 4 or 5 or more people to do this.
Anybody available Sunday (Saturday is the Christmas BBQ).